docs: stage 1 of the audit - log tailer, reconcile, sender check, guide
test / test (push) Canceled after 0s
test / test (push) Canceled after 0s
architecture.md - § Log tailer: the rotation drain does not close the gap entirely (postlogd writes to the renamed file until the reload reaches it); the fix waits for the measurement. Delivery lines read at the head of the line (M12). - § Queue reconcile: reason "reconcile", the 4 MiB cap, the conditional close; the measurement (delivery_log_days, its four counters) and the decision rule written before the data. - § Sender check, what it costs: cleanup meets a check that hangs mid-message, with the warning seen on the stand; counted once per message. guide.md - § Outbound log: `bounced` is the panel's word when Postfix no longer holds a message and the log never said; it is counted. - § Overview and Health, Sender check: the message a hung panel deferred is counted too. Audit plan line ticked, roadmap 14/61. Stage 1's code items are done (the two deferred tailer fixes wait for the data, as planned). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
+1
-1
@@ -42,7 +42,7 @@ in `git log` and [CHANGELOG.md](../CHANGELOG.md).
|
||||
| from-header-binding | Hold a message's `From:` header against the application that sends it | shipped `2.4.0` | 9/9 | [plans/from-header-binding.md](plans/from-header-binding.md) |
|
||||
| panel-redesign | Panel redesign (accepted mockups, design contract) | shipped `2.0.0` | 27/27 | [plans/panel-redesign.md](plans/panel-redesign.md) |
|
||||
| schema-squash | Squash SQLite migrations into a 2.x baseline | built in panel-redesign (stage 1) | — | [plans/panel-redesign.md](plans/panel-redesign.md) |
|
||||
| audit-2026-10-12 | Follow-ups of the 2026-10-12 full-tree code audit, seven stages | in progress (stage 0 shipped `2.4.2`; next stages 1+2 → `2.5.0`) | 13/61 | [audit-2026-10-12.md](audit-2026-10-12.md) |
|
||||
| audit-2026-10-12 | Follow-ups of the 2026-10-12 full-tree code audit, seven stages | in progress (stage 0 shipped `2.4.2`; next stages 1+2 → `2.5.0`) | 14/61 | [audit-2026-10-12.md](audit-2026-10-12.md) |
|
||||
|
||||
**Recommended order** (not binding; owner, 2026-10-09: feature order follows
|
||||
development convenience): **panel-redesign** shipped as `2.0.0` (2026-10-11) and
|
||||
|
||||
Reference in New Issue
Block a user