ci: compile the e2e on every push; test/ out of the build context (audit M20, L33)
test / test (push) Canceled after 0s

- test.yml: after go test, `go vet ./...` and `go test -c -o /dev/null .`
  in test/e2e - compiled and linked, not run. Not `go test -run xxx` as
  the plan said: TestMain would still run and bring up the stand. The Go
  cache now keys on test/e2e/go.sum too.
- .dockerignore: test (e2e leftovers in test/e2e/.stage - DKIM keys,
  sasldb2 - no longer reach the builder; the sink image is built from
  test/e2e/sink as its own context, so it is unaffected).
- development.md (test.yml line), CHANGELOG [Unreleased], audit plan
  lines ticked, roadmap 3/61.

Evidence on the test server for this tree: make e2e (no
SELFPOST_E2E_VERSION, so the "e2e" default path) exit 0, including
image_stamped_with_version and the logrotate-mode build; in test/e2e
go vet ./... and go test -c -o /dev/null . clean; docker build of
build/Dockerfile with a file under test/e2e/.stage succeeds.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
mix
2026-10-14 13:24:48 +03:00
co-authored by Claude Opus 5.5
parent 70b4eb5585
commit cc2ca3c968
6 changed files with 30 additions and 5 deletions
+1 -1
View File
@@ -42,7 +42,7 @@ in `git log` and [CHANGELOG.md](../CHANGELOG.md).
| from-header-binding | Hold a message's `From:` header against the application that sends it | shipped `2.4.0` | 9/9 | [plans/from-header-binding.md](plans/from-header-binding.md) |
| panel-redesign | Panel redesign (accepted mockups, design contract) | shipped `2.0.0` | 27/27 | [plans/panel-redesign.md](plans/panel-redesign.md) |
| schema-squash | Squash SQLite migrations into a 2.x baseline | built in panel-redesign (stage 1) | — | [plans/panel-redesign.md](plans/panel-redesign.md) |
| audit-2026-10-12 | Follow-ups of the 2026-10-12 full-tree code audit, seven stages | agreed (2026-10-12: stage 0 first, then 1+2; the rest after) | 1/61 | [audit-2026-10-12.md](audit-2026-10-12.md) |
| audit-2026-10-12 | Follow-ups of the 2026-10-12 full-tree code audit, seven stages | agreed (2026-10-12: stage 0 first, then 1+2; the rest after) | 3/61 | [audit-2026-10-12.md](audit-2026-10-12.md) |
**Recommended order** (not binding; owner, 2026-10-09: feature order follows
development convenience): **panel-redesign** shipped as `2.0.0` (2026-10-11) and