Files
selfpost/docs
mix 65a420d230 Phase 11: final security pass + acceptance (spec 7.6, 12.2-3)
Line-by-line audit of all 8 points of spec 7.6 against the code: full
compliance, no code changes required. Acceptance verified on the dev
server (image selfpost:p11): gofmt/vet/build/test green, docker build
ok, clean container start (all processes RUNNING, panel as non-root
uid 999, setup link + 0600 token, bogus token 404, unauth 303, healthz
200). Baseline v1.0 plan (phases 0->11) complete.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-15 21:42:27 +03:00
..