test / test (push) Canceled after 0s
Agreed with the owner, one question at a time; documents only, no code. From from-header-binding's Not done list, each a step of the audit plan: the Sender check column says "Connections turned away"; a stand test of which key OpenDKIM signs with; Health connects to a milter socket instead of stat-ing it; the cards layout orders a phone by the box's number; a refusal the panel did not write is recovered from mail.log; a log rotated while the panel was down is read to its end; the deferred counter keeps a place in the log; downtime is counted when supervisord is silent. "Today, UTC" became the roadmap item local-time (agreed): one instance zone, no labels beside a time, days counted in that zone, with the conditions for per-user zones and offsets, and the trap of mail.log's own stamps written down. The six steps on the log tailer are split off stage 1 into stage 2b, a cut of its own (2.5.1); stages 3 and 4 move to 2.5.2 and 2.5.3. Also: negative e2e cases pass only on their own refusal (stage 0); notifications are owed per recipient (stage 4); a DNS outage is unknown, not wrong (M14, M15 had no step); DMARC reports tested where they come in. review-2026-08-followups is closed, its rows placed in stages or dropped with a reason. Certificate warnings by lifetime: left as is, with the condition for return. The audit's checklist is 61 lines (was 48). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>