A single security pass once B.1-B.3 and C.4 are in, not four per-item
passes: those four rewrite authentication, log-file handling, the
entrypoint gate and the release workflow, so what matters is the final
state. Scope is the whole diff since v1.0.0 (phases 12-14 included)
plus a fresh walk over spec 7.6, run by Fable rather than Opus so the
reviewer is not the author. Findings are either fixed before the tag
or recorded in section A as accepted risks; together with the C.4 e2e
this gates tagging. The old section D (2.x pointer) becomes E, its
items renumbered 6 and 7.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>