Files
selfpost/docs/plans
mixandClaude Opus 5.5 86665f08e6
test / test (push) Canceled after 0s
audit: decisions of 2026-10-13/14 on what 2.4.0 left undone
Agreed with the owner, one question at a time; documents only, no code.

From from-header-binding's Not done list, each a step of the audit plan:
the Sender check column says "Connections turned away"; a stand test of
which key OpenDKIM signs with; Health connects to a milter socket instead
of stat-ing it; the cards layout orders a phone by the box's number;
a refusal the panel did not write is recovered from mail.log; a log
rotated while the panel was down is read to its end; the deferred counter
keeps a place in the log; downtime is counted when supervisord is silent.
"Today, UTC" became the roadmap item local-time (agreed): one instance
zone, no labels beside a time, days counted in that zone, with the
conditions for per-user zones and offsets, and the trap of mail.log's own
stamps written down.

The six steps on the log tailer are split off stage 1 into stage 2b, a
cut of its own (2.5.1); stages 3 and 4 move to 2.5.2 and 2.5.3.

Also: negative e2e cases pass only on their own refusal (stage 0);
notifications are owed per recipient (stage 4); a DNS outage is unknown,
not wrong (M14, M15 had no step); DMARC reports tested where they come in.
review-2026-08-followups is closed, its rows placed in stages or dropped
with a reason. Certificate warnings by lifetime: left as is, with the
condition for return.

The audit's checklist is 61 lines (was 48).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-14 07:29:13 +03:00
..