docs: stage 2b of the audit - the log tailer, refusals, the Sender check card
test / test (push) Canceled after 0s

architecture.md
- § Log tailer: the fingerprint carries the inode; a log rotated while the
  panel was down is read from mail.log.1 to its end, or the gap is logged;
  a refusal's line (the queue id of a From: refusal, the NOQUEUE line put on
  a MAIL FROM refusal's row) and the refusal written from mail.log when the
  panel had not.
- § Sender check, what it costs: supervisord asked for half a minute, then
  the estimate and ≈; connections and messages in two columns; the count's
  saved place in the log.

guide.md
- § Outbound log: a refused message's page shows Postfix's line(s); rows
  from before, and a row written from mail.log, say so.
- § Overview and Health: the two columns and ≈.

schema-migrations row 9 was written with the migration. Audit plan line
ticked: stage 2b's lines are all done. Roadmap 30/62.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
mix
2026-10-14 17:19:05 +03:00
co-authored by Claude Opus 5.5
parent 415334c2cc
commit 5154bba61c
4 changed files with 60 additions and 26 deletions
+1 -1
View File
@@ -42,7 +42,7 @@ in `git log` and [CHANGELOG.md](../CHANGELOG.md).
| from-header-binding | Hold a message's `From:` header against the application that sends it | shipped `2.4.0` | 9/9 | [plans/from-header-binding.md](plans/from-header-binding.md) |
| panel-redesign | Panel redesign (accepted mockups, design contract) | shipped `2.0.0` | 27/27 | [plans/panel-redesign.md](plans/panel-redesign.md) |
| schema-squash | Squash SQLite migrations into a 2.x baseline | built in panel-redesign (stage 1) | — | [plans/panel-redesign.md](plans/panel-redesign.md) |
| audit-2026-10-12 | Follow-ups of the 2026-10-12 full-tree code audit, seven stages | in progress (stage 0 shipped `2.4.2`, stages 1+2 `2.5.0`; next stage 2b → `2.5.1`) | 29/62 | [audit-2026-10-12.md](audit-2026-10-12.md) |
| audit-2026-10-12 | Follow-ups of the 2026-10-12 full-tree code audit, seven stages | in progress (stage 0 shipped `2.4.2`, stages 1+2 `2.5.0`; next stage 2b → `2.5.1`) | 30/62 | [audit-2026-10-12.md](audit-2026-10-12.md) |
**Recommended order** (not binding; owner, 2026-10-09: feature order follows
development convenience): **panel-redesign** shipped as `2.0.0` (2026-10-11) and