roadmap: audit-2026-10-12 agreed, stage 0 first
test / test (push) Canceled after 0s

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
This commit is contained in:
mix
2026-10-12 23:15:49 +03:00
co-authored by Claude Fable 5.1
parent e3bcafb6d9
commit 6d9273f418
+1 -1
View File
@@ -42,7 +42,7 @@ in `git log` and [CHANGELOG.md](../CHANGELOG.md).
| from-header-binding | Hold a message's `From:` header against the application that sends it | shipped `2.4.0` | 9/9 | [plans/from-header-binding.md](plans/from-header-binding.md) |
| panel-redesign | Panel redesign (accepted mockups, design contract) | shipped `2.0.0` | 27/27 | [plans/panel-redesign.md](plans/panel-redesign.md) |
| schema-squash | Squash SQLite migrations into a 2.x baseline | built in panel-redesign (stage 1) | — | [plans/panel-redesign.md](plans/panel-redesign.md) |
| audit-2026-10-12 | Follow-ups of the 2026-10-12 full-tree code audit, six stages | candidate | — | [audit-2026-10-12.md](audit-2026-10-12.md) |
| audit-2026-10-12 | Follow-ups of the 2026-10-12 full-tree code audit, six stages | agreed (2026-10-12: stage 0 first, then 1+2; the rest after) | 0/6 stages | [audit-2026-10-12.md](audit-2026-10-12.md) |
**Recommended order** (not binding; owner, 2026-10-09: feature order follows
development convenience): **panel-redesign** shipped as `2.0.0` (2026-10-11) and